trail news and information for Nevada mountain bikers

dale beesmer
NV IMBA State Rep

Home Trail Calendar NV News NV Trail Info NV Epic Rides What YOU can do


IMBA Trail Building School - February 6-8, 2004 - Reno, NV
THE STAIR CASE
   
Before...                                 After

Shown above is an alternate line offering a technical trail feature (ttf) off the main trail. Using medium to large rocks around an existing outcropping, an armored stairway was built with a roll able drop at the end.

Important points of feature construction for this challenge section include:
-armored (rock) stair step for long term durability, sustainability
-excellent line of sight for rider dropping back on to main trail
-entrance line obscured so less experienced riders don't stray on to
-entrance line is actually more difficult than the "main feature" to prevent riders from getting in over their ability

 

 




the "qualifier"

Riding the optional line to the stair case and drop is actually harder than the main feature.

The bigger rocks on the right force riders to take the stone pitched entrance preceding the stair case and rock drop.




 



 

 

 

 

 

   

Return to Reno Wheelmen website